Downtown Rochester is getting a face lift with some new urban design

Rochester Ramp

Location:
Rochester, MN
General Contractor:
Kraus Anderson
Architect/Engineer:
Collaborative Design Group
Owner:
City of Rochester
Description: 

A moderately busy downtown block in Rochester, MN will get narrower as a result of a new $20 million, six stories high, parking ramp that’s being built. The ramp design features urban design standards that conform to Destination Medical Center guidelines and includes a pedestrian promenade, as well as one underground level. The year-long construction is expected to conclude in May 2018. The design conformed closely to the vision laid out in the DMC Design Guidelines, and while the design process started before the design guidelines were published, the final product matched the DMC vision. Overall, the ramp will have space for 640 cars. Ninety of those stalls are dedicated to the other building on the block, the under-construction Hilton Hotel building. The parking ramp and the Hilton will connect in several places, including at the skyway level.

Wells Concrete produced and erected more than 20,000 sq. ft. of precast for the project, including some unique arch pieces.  The top arch sits on a bottom arch on each side.  There are two complete arches, going over a railroad track that goes under the ramp.  These are precast with no strand, using curved rebar.  The top arch is 45′-9.5″ out to out with a rise of 9′-6″ to the top.  The section is 34″ deep, 16″ wide and a taper to 23’’ wide on the top side in erected position, with a sandblast finish. In addition to the arched pieces, Wells also provided architectural wall panels with beautiful cornices and terra-cotta accents.

Product

Sq. Ft

#
Arch Solid Wall              20,603 215
Flat Architectural                     60 4

For more information about this project, contact Spencer Kubat or Josh Evan.