CHS Addition

Creston, IA

A total precast structure, incorporating flat walls, beams, wind beams, columns, roof tees, and mezzanine/floor tees. This project was converted over to a total precast structure from a partial precast project that only utilized a precast fire wall. SMA (the contractor) worked very closely with Wells Concrete in the design phase to help make it very precast friendly. The most impressive portion of the building is the 80′ tall bin storage room. This incorporated 80′ tall, 24″x30″ columns that weighed 60,000 pounds. Two levels of wind beams running between the columns were utilized, and 40′ tall stacked wall panels and 42″ deep roof tees enclosed this structure.