Richfield Honda

HondaRichfield.2014#6059.Bloomington.MN

Location:
Richfield, MN
General Contractor:
Reiner Construction
Architect:
Architectural Alliance
Engineer:
Shirk & O’Donovan Consulting Engineers, Inc.
Owner:
Woods Automotive Group
Precast Products:
Beams, Columns, Double Tee, Insulated Wall Panel
Finishes:
Sandlbast

 

Time-Lapses Project Video


Description: 

This total precast project is extremely unique and therefore dubbed the ‘jewelry box’ on 494 as it feature a two-story ‘display case’ for eight cars visible from the freeway.

Construction of the new 100,000 sq. ft. RB Honda dealership began in June 2014 with Reiner Construction (Columbus, OH); Architectural Alliance (Columbus, OH) on the design side; and Shirk & O’Donovan Consulting Engineers (Worthington, OH).  Wells Concrete produced and installed architectural and structural precast product for the facility.

The design allows the dealership to prominently display four cars on the second floor and four more on the third floor as well as service parking on the roof for as many as 130 cars. The new building was built on an adjacent site, where RB Honda bought a trio of buildings formerly occupied by LaMettry’s Auto Body, USA Baby and Tires Plus.  Tom Wood Automotive Group also built a 26,200-square-foot facility for Richfield Bloomington Mitsubishi on part of the current RB Honda site.  The total construction costs for the new Honda and Mitsubishi stores to approximately $27 million.

 

Product # of pieces Linear Ft Square Ft # of pours
Colums 52 1,730 27
Beams 53 1,284 25
DT’s 197 10,430 82,700 54
Insul Sandblast Walls 238 6,445 52,440 61
Solid Walls 63 2,180 17,540 20
Flat Slabs 62 1,420 13,000 13

 

 