The Sartell-St. Stephen school district gets collaborative learning environments with new high school

Sartell-St. Stephen New High School

Sartell, MN
General Contractor:
Winkelman Building Corporation
Cuningham Group Architecture
Sartell-St. Stephen School District

The new $89.5 million high school is expected to open in Sartell in the Fall of 2019 with a large commons area, learning neighborhoods and multiple activities spaces.

The 292,408 sq. ft. school includes three learning neighborhoods of 450 students each, accommodating about 1,350 students. The project also includes a large student commons and food service area, an 800-seat theater, a 4-station gymnasium and pool, and a full complement of spaces for music, art and drama.

Get a bird’s eye view of the Sartell High School Construction here.

Wells concrete provided nearly 115,000 square feet of precast concrete for this beautiful new school.  A mix of acid etch, sandblast, and polished finishes were used on more than 200 pieces of insulated wall panels.  In this total precast project, we also incorporated structural wall panels, double tees, hollowcore plank, stadia, beam and columns.


Product # Sq. Ft. Finish
Flat Structural Panel 8″ 16 1,665
Architectural Insulated Wall Panel 10′ Wide – Gym 80 29,216 Acid Etch, Sandblast, Polish
Architectural Insulated Wall Panel 12′ Wide – Pool 42 14,974 Acid Etch, Sandblast, Polish
Architectural Insulated Wall Panel 8′ wide – Brick 88 26,013 Acid Etch, Sandblast, Polish
Structural Wall Panel – 11′ Wide 22 2,327
Hollowcore Plank 10″ 82 9,498
Hollowcore Plank 12″ 42 6,500
Hollowcore Plank 8″ 136 10,129
Stadia 22 514
Beam 10 224
Column 3 87
Double Tee 15 12,920
Totals 558 114,067

For more information about this project, contact Rick Girard.